Salal Dam Spillway Gates Opened Amid Rising Water Levels in Chenab River

Reasi, Jammu & Kashmir — The authorities at the Salal Hydroelectric Power Project opened multiple spillway gates to regulate rising water levels following heavy, continuous rainfall across upper catchment areas.

Key Developments & Safety Measures

  • Water Discharge: The gates were lifted as a precautionary measure to manage severe inflows into the reservoir and protect the structural integrity of the dam while preventing uncontrolled downstream flooding.
  • Public Advisory Issued: The district administration in Reasi, alongside project engineers, issued safety alerts advising residents in downstream and low-lying riparian areas along the Chenab River to stay clear of riverbanks and avoid water bodies.
  • Regional Impact: Continuous monsoon downpours across Jammu and Kashmir have elevated water levels across several regional hydroelectric installations on the Chenab basin, requiring coordinated monitoring by civil authorities and emergency management teams.

More From Author

Tamil Nadu Scraps Controversial Order Barring Students from Joining Protests

Russia–Myanmar Nuclear Cooperation: Strategic Analysis & Key Agreements

Leave a Reply

Your email address will not be published. Required fields are marked *